Great Western Route Modernisation: Design & Installation

This project was part of the well-known Great Western Electrification Programme. BCM were contracted by Network Rail to Design and Install a HV Independent Feeder cable between the new substations at Royal Wootton Bassett ATFS and Thingley Junction ATFS. The total length of this feeder install was 23km. 46km of Positive and Negative HV cable was installed along with 11000m of Neutral Cable. An Independent Feeder cable provides additional resilience to the electrification system.