BCM Construction was contracted by Amey Rail to extend the 4 platform lengths at Kettering station to serve new 240m trains following the December 2019 timetable change on the fast and slow lines. This will increase capacity on the Midland Mainline for Network Rail.

BCM Construction was responsible for the provision of all labour through Crewit Resourcing, plant through CHS, and signed off temporary works design by Equate Design Ltd. Further to this, materials, equipment, machinery, and installation to carry out the extension of 4no. platforms at Kettering Station were the responsibility of BCM.