Projects

TRP E&P Resilience Programme

BCM Construction were hired by Network Rail to survey electrical assets along with installing ramp end shrouding and replacing lugs on jumper cables. These works took place between London Victoria Station to Balham Station, North Dulwich to Eastfeild and Earlswood to Preston Park.

Scheme

Resilience Programme

Location

South London

Case study

Download project case study
Scroll Up