Projects

Tunbridge Wells Power Supply Enhancement

The objective of the overall project is to improve system resilience and prevent further equipment failures between Tonbridge and Tunbridge Wells which have been caused by the introduction of 12-car electric train formations to Tunbridge Wells.

Scheme

Power Supply Enhancement

Location

Tunbridge Wells

Case study

Download project case study
Scroll Up